Sinomining Changan W2E Fully Automatic Waste Leachate Dredging System

Fully Automatic Waste Leachate Dredging System

The automatic dredging system of the leachate grille, with One-click operation of the control system through the man-machine interface, creates the action control of the dredging mechanism, and complete the intelligent dredging of the holes in the leachate collection grille of the garbage pond. The system replaces the traditional manual regular dredging with an intelligent dredging system; the dredging process is controlled with one key and has a high degree of automation. The dredged leachate collection grille can meet the needs of leachate diversion in the garbage tank; the dredging process is safe, efficient and reliable.

Product advantages

1) Excellent safety. The dredging system is designed in accordance with the explosion-proof level of the underground coal mine, and the leachate channel is unmanned and non-electrified; the hidden dangers of explosion are eliminated during the operation process, and the direct contact between employees and harsh environments such as corrosion, toxic gases, viruses and bacteria is eliminated, effectively preventing the occurrence of vicious accidents; the dredging system can still work when the channel is flooded.

2) Good economic benefits.Through automated operations, the efficiency of leachate diversion and discharge has been improved, and the moisture content in the garbage has been reduced; the thermal burning rate of slag has been reduced, the thermal efficiency of combustion has been improved, and economic benefits have been improved.

3) Help the construction of smart power plants.The dredging system connects intelligent inspection, intelligent communication, and monitoring, realizes one-key start-stop, unattended and other functions, and accesses the intelligent production control center.

4) The installation is simple and convenient.Tailored according to the project site, it adopts a modular design and does not require any embedded parts. It is suitable for both new construction projects and technical reform projects.

Main technical parameters: Power supply level: AC-220V/380V, 50Hz; installed power: 5.5~15kW; system working pressure: 5.5~16MPa; window size: customized with the project

 

 

Related Post

ArabicEnglishFrenchRussianVietnamese
× How can I help you?